TOOL MANUFACTURE

    Base on final part drawing, DFM and mould drawings approved, we begin to build the tooling and prepare the first trial samples which typically occurs within a 3-5weeks. After samples to check and confirm with final components no problem by customer, mass production will be done soon...

    Copyrights © 2017 All Rights Reserved Shenzhen huaxu precision technology Limited